CASE Tool 9-1: A Guideline Addressing Coordination and Completeness of Structural Construction
$30 Members | $60 Non-Members
Description
CASE Tool 9-1: A Guideline Addressing Coordination and Completeness of Structural Construction Documents
Inadequate and/or incomplete design drawings often result in inaccurate competitive bids; delays in schedule; a multiplicity of requests for information (RFIs), change orders and revision costs; increased project costs; and a general dissatisfaction with the project. The guidelines presented in this document will assist not only the structural engineer of record (SER) but also everyone involved with building design and construction in improving the process by which the owner is provided with a successfully completed project.
There are two PDF files included with the Tool: one with Tool 9-1 and the other with the CASE Drawing Review Checklist.
Please see companion document, CASE 962-D - Practice Guidelines Addressing Coordination and Completeness of Structural Construction Documents
Available for immediate download.
The complete library of coalitions documents is free to current ACEC Coalitions members. For information on joining ACEC Coalitions, please contact Michelle Kroeger, Coalitions Director, at mkroeger@acec.org.