EJCDC D-001: Commentary on the 2016 EJCDC Design-Build Documents
EJCDC D-940 Work Change Director (2016)
EJCDC D-800 Supplementary Conditions, Owner-Design-Builder (2016)
EJCDC D-523 Construction Subcontract for Design-Build Project (2016)
EJCDC D-512 Agreement Between Owner and Design Builder for Progressive Design-Build (2016)