EJCDC E-562: Labor and Materials Subcontract between Engineer and Engineer’s Subcontractor (2017)
$40 Members | $80 Non-Members
Description
EJCDC® 2017 E-562, Labor and Materials Subcontract between Engineer and Engineer’s Subcontractor.
Available for immediate download in MS Word format. Hard copy NOT available.
EJCDC® E-562 is intended for use when a subcontractor provides labor and materials to an engineering firm (“Engineer”).
The previous edition of EJCDC® E-562 was titled Subcontract between Engineer and Engineer’s Subcontractor. The new and retitled 2017 edition of EJCDC® E-562 expands the application of the previous edition by emphasizing issues associated with delegating minor construction tasks.
Examples of work that might be performed under EJCDC® E-562 include:
- furnishing temporary field facilities for the Engineer’s use during a project
- placement and maintenance of safety barriers to protect Engineer’s work during field studies
- exploratory excavation
- construction of monitoring facilities for Engineer’s use and other limited labor and supply support for the Engineer